What is happening?
·
Monash Medical Centre (MMC)
has scheduled the annual Planned Code Yellow “Black Start” emergency power
supply exercise for Wednesday December 6, 2015
·
The exercise will commence
at 7am and is scheduled to conclude at 8am.
·
Announcements will be made
over the public address system at the commencement and conclusion of the
planned Code Yellow exercise.
How will it impact me?
·
MMC will lose power briefly
at 7am when the exercise commences, and again at 8am when the exercise
concludes.
·
Between 7 and 8am MMC will
operate on Generator power.
·
Air conditioning and
lighting will be interrupted for brief periods of time
·
Equipment operating on UPS
power will not experience any power interruption.
How Do I Learn More?
·
Information Sessions are
being held for staff:
·
All Line Managers, Zone
Wardens and interested staff are encouraged to attend
•
10am Tuesday November
28, 2017. Lecture Theatre 3
•
2pm Thursday November
30, 2017, Lecture Theatre 2
What is a Code Yellow “Black Start” exercise?
·
Our Engineering team
undertakes a “Black Start” planned exercise annually to test and demonstrate
that the emergency power supply system performs as an integrated system and
continues to deliver power to critical services in the event that the mains
power supply is lost.
·
The exercise is also used
to demonstrate the orderly restoration of supplies once the normal power source
has been restored
What about safety?
·
All works performed by
engineering staff and contractors during the planned Code Yellow Black Start
exercise are performed with appropriate tools, controls and PPE, and follow
Safe Work Methods.
·
Equipment operating on
Building UPS power will not experience any loss of power.
·
Briefing sessions have been
scheduled to provide all staff the opportunity to understand the exercise and
the potential impacts to MMC.
How do I get more information?
Come along to
one of the information sessions or contact Site Management with any specific
enquiries
•
Telephone:
03 959 44727